The tower base is “clean” and waiting.

It was a beautiful day at lunchtime when the clouds were shading the area and a breeze was blowing.  Unfortunately, little of either happened during removal of the concrete’s frame or supporting 2 x 4’s during lunchtime today.  The base is ready to have the tower attached at the pivot points during this afternoon’s “play session”.IMG_20150715_130844493

In addition we could build the gin pole inside and take benefit of the air conditioned climate.

Gin Pole

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s